Total Clashes
5
Open
2
In Progress
2
Resolved
1
Rejected
0
Critical
2
Filter:
| ID | Disciplines | Description | Location | Priority | Status | Assigned | Due Date | Actions |
|---|---|---|---|---|---|---|---|---|
| CLH-001 | HVACvsStructure | Large supply air duct penetrates primary beam at grid B-4 without sleeve | Level 3, Grid B-4 | π΄ Critical | Open | M. Torres | Jun 25 β | |
| CLH-002 | PlumbingvsElectrical | Domestic hot water riser conflicts with main electrical cable tray in ceiling void | Level 2, Riser Core A | π‘ Major | In Progress | S. Kim | Jun 28 | |
| CLH-003 | ArchitecturevsStructure | Raised floor in server room overlaps structural column base plate | Level 1, Room 104 | π‘ Major | Resolved | A. Patel | Jun 15 | |
| CLH-004 | Fire ProtectionvsHVAC | Sprinkler branch line crosses HVAC supply duct with only 20mm gap | Level 4, Zone C | π΄ Critical | In Progress | J. Reyes | Jun 22 | |
| CLH-005 | ElectricalvsStructure | Conduit bundle routing conflicts with shear wall opening on north facade | Level 5, North | π’ Minor | Open | Unassigned | Jul 5 | |