Tip: Levels are created in the project using an Elevation or Section view. Drag the level head to set the elevation or type a value directly.
Tip: Grids are placed in plan views. Go to Architecture tab → Datum panel → Grid. Click to start and end each grid line. Double-click the grid head to rename.
Survey Point: Represents a known real-world coordinate (e.g. a benchmark). Move it to establish shared coordinates.
Project Base Point: Defines the building's origin (0,0,0) in project coordinates. Usually set at a corner or entry point.
How to enable Worksharing: Go to Collaborate tab → Manage Collaboration → Enable Worksharing. Then create the worksets listed here.
Each team member should own one workset. Elements assigned to a workset can only be edited by that workset's owner.