A 26-section interactive field reference of 22 real pass/fail/N/A checklist tables, organized into four parts — residential, commercial, specialized (grounding/lightning, PV/battery/generator, hazardous locations, health care and educational occupancies, temporary power), and compliance/documentation — each table listing the category, the exact requirement to verify, and the governing NEC code reference.
Part II (Residential) covers service entrance & metering, panelboards & circuits, branch circuit wiring methods, lighting/outlets/receptacles, grounding & bonding, and the final residential walk-through. Part III (Commercial) covers service & distribution, panelboards/feeders/transformers, commercial wiring methods, emergency/exit lighting, motor & HVAC circuits, fire alarm & low-voltage systems, and final commercial sign-off. Part IV (Specialized) covers grounding & lightning protection, PV/battery/generator systems, hazardous locations, health care/educational occupancies, and temporary power. Part V (Compliance) covers documentation & recordkeeping, deficiency correction, inspector coordination, and final certification.
Use the Prev / Next buttons at the bottom, or press the arrow keys on your keyboard. Click the ☰ menu button in the top-right to open the table of contents and jump directly to any of the 22 checklist tables. Each part opens with a short framing slide explaining what it covers and when a field inspector reaches for it.
Electrical inspectors and AHJ staff who want a consistent, printable checklist format across occupancy types; electrical contractors and journeymen preparing for a rough-in or final inspection; and PE/journeyman/master electrician exam candidates who want to see how NEC articles map onto a real field checklist rather than the code text alone.
Four parts and 22 checklist tables total: Part II Residential (6 checklists — service entrance/metering, panelboards & circuits, branch circuits & wiring methods, lighting/outlets/receptacles, grounding & bonding, final residential inspection), Part III Commercial (7 checklists — service & distribution, panelboards/feeders/transformers, commercial wiring methods, emergency/exit lighting, motor/HVAC circuits, fire alarm/low-voltage systems, final commercial inspection), Part IV Specialized (5 checklists — grounding/lightning protection, PV/battery/generator systems, hazardous locations, health care/educational occupancies, temporary power), and Part V Compliance (4 checklists — documentation/recordkeeping, deficiency correction, inspector coordination, final approval/certification).
That 105-plate reader is a narrative visual walkthrough of the inspection process with illustrated plates and prose. This guide is a pure fillable-checklist field reference — real category/requirement/reference tables meant to be printed and used as a field form, with no narrative photos or plates.
Yes. Every category, requirement, and NEC article/section reference is transcribed directly from the source checklist tables. Where a row has no specific code reference (administrative or recordkeeping items), the reference column shows a dash rather than an invented citation.
The checklists reference NFPA 70, the National Electrical Code, 2023 Edition. Always confirm which edition your local jurisdiction has adopted, since amendment cycles vary by state and municipality.
Yes — that is their intended use. Each table lists Category, Requirement to Verify, and Reference; print or copy a table and add your own pass/fail/N/A and notes columns for the actual field walk-through, or use it purely as a study and reference companion to the code book.
Disclaimer: This guide is a study and field-reference aid summarizing general NEC inspection checklist categories for educational purposes only. Always verify current code edition, local amendments, and AHJ-specific requirements before performing or relying on any actual electrical inspection.