Small Commercial BIM Workflow — Start to Finish

One real building — a 2-story, 18,000 sq ft mixed-use retail/office building — carried through all 6 stages of a multi-discipline BIM coordination workflow, from Revit setup to a finished QA review.

6 steps. Steps 1-2 are free. Steps 3-6 unlock with a one-time $4.99 purchase.

6 StepsMulti-Discipline RevitReal ToolsOne Building, Start to Finish

The Workflow

🗂️
Step 1
Revit Setup

Linked-model structure across 5 disciplines — shared coordinates, levels, grids, and worksets.

🏗️
Step 2
System Modeling

Each discipline models its real building systems against the shared setup from Step 1.

⚠️
Step 3🔒
Clash Coordination

Hard and soft clash detection across the federated model, resolved via coordination meetings.

📋
Step 4🔒
Schedules

Live, model-driven room/finish and equipment schedules that stay accurate through model changes.

📄
Step 5🔒
Sheet Production

The construction document set produced directly from the coordinated model.

Step 6🔒
QA Review

The final pre-issue model QA pass — integrity, consistency, and standards compliance.

Educational project reference. This project walks through a realistic scenario using the site's real calculators and written guides — it is a learning and reference resource, not a permit-ready construction document. Final system design, code compliance, and installation require a licensed engineer or contractor. See our full disclaimer.