Practice
Worked Problems & Engineering Challenges
Solved engineering problems with every step shown, plus short challenges where you find the mistake before opening the answer. Each page lists the given data, the method, the answer and the usual errors.
See the problemsElectrical & Power
Size the Branch Circuit for a 40 hp, 460 V Motor
Conductor size, breaker, overload setting and disconnect rating for a 40 hp, 460 V, 3-phase induction motor, using NEC Article 430 tables.
Voltage Drop on a 240 V Single-Phase Feeder
Calculate percent voltage drop for a 50 A load 150 ft from the panel and choose a conductor that meets the 3% guideline.
Office Lighting Load: Connected Power and Current
A short project: total the connected lighting power for three spaces, convert to apparent power and estimate the current, then write the calculation up so another engineer can check it.
Challenge: The Current That Looks Too High
An engineer calculates a three-phase line current as 37.5 A for a 12 kW load. Find the error before opening the answer.
Size a Three-Phase Transformer for a Mixed Load
Total the connected kVA of lighting, receptacle, HVAC and miscellaneous loads, add growth, choose a standard kVA rating, and find the primary and secondary full-load currents.
Power Factor Correction: How Many kvar of Capacitors?
Find the capacitor kvar needed to raise a 500 kW load from 0.80 to 0.95 power factor, and the drop in apparent power and line current.
Short-Circuit Current at a Transformer Secondary
Estimate the available fault current on the secondary of a 500 kVA, 480 V transformer with 5.75% impedance, assuming an infinite bus.
Motor Input Power, Current and Efficiency
Find the electrical input power, apparent power and line current of a 30 kW, 400 V three-phase motor at 92% efficiency and 0.86 power factor.
Fault Current at the End of a Feeder
Add a 150 ft copper feeder to the transformer fault calculation and compare the fault current at the terminals with the current at a downstream panel.
Unbalanced Three-Phase Loads: Find the Neutral Current
Calculate the neutral current for phase currents of 100 A, 80 A and 60 A at unity power factor, and see why adding the magnitudes gives the wrong answer.
UPS Runtime: Energy, Efficiency and Usable Capacity
Estimate the runtime of a 2 kW load on a 48 V, 100 Ah battery bank from usable capacity and inverter efficiency, and see the limits of the model.
Solar PV String Voltage on a Cold Day
Correct a module open-circuit voltage for a β10 Β°C cell temperature and check how many modules in series stay under a 1,000 V inverter limit.
Mechanical, HVAC & Fluids
Pump Head, Shaft Power and Motor Size
Total dynamic head, hydraulic and shaft power, and a standard motor size for water at 20 L/s through 100 m of 150 mm pipe.
Sensible Cooling Capacity from Airflow and Temperature Difference
Use Q = 1.08 Γ CFM Γ ΞT to find the sensible cooling delivered by 2,000 CFM of air at a 20 Β°F temperature drop, and convert it to tons.
Chilled-Water Flow Rate from Load and Delta-T
Use GPM = 24 Γ tons Γ· ΞT to find the chilled-water flow for a 120-ton load at a 10 Β°F temperature rise.
Counterflow Heat Exchanger: Log-Mean Temperature Difference
Calculate the LMTD and the heat duty of a counterflow exchanger with hot fluid cooling from 150 Β°C to 90 Β°C and cold fluid heating from 30 Β°C to 70 Β°C.
Total Cooling Load from Air Enthalpy
Find total cooling capacity from dry-air mass flow and enthalpy change, then the latent capacity and sensible heat ratio against a 30 kW sensible load.
Fan Laws: What Changes When Speed Drops?
Estimate airflow, pressure and shaft power when a fan slows from 1,200 to 900 rpm, and why the cube law does not predict electricity savings.
Pipe Pressure Loss: Straight Pipe Plus Fittings
Use DarcyβWeisbach and fitting K values to find the water pressure loss in a short DN100 line and see whether pipe or fittings dominate.
Pump Cavitation Check: NPSH Available vs. Required
Calculate NPSH available for 60 Β°C water from an open tank at 1,500 m elevation and compare it with NPSH required plus a stated margin.
Refrigeration COP and Compressor Power
Find the compressor input power and the heat rejected at the condenser for a cooling system with a 35 kW evaporator load and a COP of 3.5.
Civil & Structural
Simply Supported Beam: Reactions, Moment and Deflection
Find the reactions, maximum moment and midspan deflection of a 6 m steel beam under a 15 kN/m uniform load, and check it against L/360.
Cantilever Beam: Tip Load and Deflection
Find shear, fixed-end moment, bending stress, tip deflection and rotation of a 2 m steel cantilever with a 10 kN end load, checked against L/180.
Column Buckling: Why End Conditions Matter
Compare the Euler buckling load of one slender steel column pinned at both ends and fixed at both ends, and why Euler is not a full column check.
Footing Bearing Pressure with an Eccentric Load
Find maximum and minimum soil pressure under a 2.5 m Γ 2.0 m footing with an axial load and moment, and check the middle-third rule.
Stormwater Runoff Using the Rational Method
Estimate peak runoff for a 3.5 acre catchment with Q = CiA, show the unit conversion to cfs, and explain why duration equals time of concentration.
Earthwork Cut and Fill by the Average-End-Area Method
Calculate cut and fill between four 50 ft cross sections, then apply swell and shrinkage factors while keeping bank, loose and compacted volumes separate.
Chemical & Process
CSTR vs PFR: Conversion for a First-Order Reaction
Compare the conversion of a first-order reaction (k = 0.5 per minute) in a CSTR and a PFR with the same 4-minute residence time.
Mixing Two Solutions: Flow and Concentration
Mix two streams of different flow and solute mass fraction with a steady-state mass balance, and find the flow of stream B for a 20% mixture.
Single-Effect Evaporator: Water Removed and Product Flow
Concentrate a 5,000 kg/h feed from 10% to 35% solids and find the product flow, water evaporated, heat duty, steam use and steam economy.
Arrhenius Equation: How Temperature Changes Reaction Rate
Calculate how much faster a 75 kJ/mol reaction runs at 35 Β°C than at 25 Β°C with the Arrhenius equation, and the error of using Celsius.
Recycle and Purge: Preventing Inert Buildup
Calculate purge, recycle and reactor feed flows for a process with 30% single-pass conversion and a 20% inert limit, and close the inert balance.
Batch Reactor: Time to Reach a Target Conversion
Find the batch time for 90% conversion of a first-order reaction (k = 0.5 per minute) and compare it with ideal CSTR and PFR residence times.
Controls & Instrumentation
4-20 mA Signal Scaling for a Pressure Transmitter
Convert a 4-20 mA reading to engineering units for a 0 to 10 bar transmitter, and work backward to the expected current for a given pressure.
Control Valve Sizing: Calculate Cv for a Water Line
Calculate the flow coefficient Cv for 100 GPM of water across a 25 psi pressure drop, and see how Cv changes with flow and pressure drop.
Hydrostatic Level Measurement: Pressure to Tank Level
Convert a 24.5 kPa bottom gauge pressure into tank level for a 1,150 kg/mΒ³ liquid and see how the wrong density shifts the indicated level.
Differential-Pressure Flow: Why 50% Signal Is Not 50% Flow
Convert a 12 mA signal from a linear differential-pressure transmitter into flow with the square-root law, and compare a flow-linear output.
First-Order Sensor Response: Time Constant and Settling
Calculate the indicated temperature after a step change for a sensor with a 12-second time constant, and find the time to reach 95% of the final change.
PLC Analog Input: Raw Counts to Engineering Units
Convert raw PLC input counts into temperature using stated counts at 4 mA and 20 mA, and find the raw-count value of an alarm threshold.
Measurement Uncertainty: Combining Independent Inputs
Combine independent uncertainties in P = V Γ I by root-sum-square and compare the result with a worst-case bound.
Fire Protection
Sprinkler Flow from K-Factor and Pressure
Use Q = K Γ βP to find the flow from a K-5.6 sprinkler at 7 psi and the density it delivers over a 130 ftΒ² coverage area.
Fire Alarm Control Panel Battery Calculation
Size the standby battery for a fire alarm panel with 0.5 A standby and 2.5 A alarm current, using a 24-hour standby period and 5 minutes of alarm.
Fire Alarm NAC Voltage Drop with Distributed Devices
Calculate the voltage drop segment by segment for eight notification appliances spaced along a circuit and compare it with the common end-of-line method.
Sprinkler Branch Line: Work Back from the Remote Head
Work back from a 15 gpm remote sprinkler through three heads, friction and a 4 ft rise, letting each head flow more as its pressure rises.
Fire Pump Duty: Flow, Pressure and Elevation
Build a simplified pressure budget for a 750 gpm demand with elevation, friction and suction pressure, and check it against a supplied fire pump curve.
Fire-Water Storage: Demand, Duration and Usable Volume
Size a fire-water tank for a 750 gpm demand over 90 minutes, add unusable volume, and find the water depth in a 30 ft diameter tank.
Challenge: Can You Add Two Sprinkler Pressures?
An engineer adds the pressures of two parallel sprinklers to get 14 psi. Find the mistake and how flow and pressure behave at a junction.
How these pages work
Read the given data
Each problem states its inputs, units and assumptions up front.
Try it first
Work the problem on paper before reading the steps.
Compare your method
Check each step, not just the final number.
Check the usual errors
Every page lists the mistakes that most often cause a wrong answer.
Questions
Are these real design calculations?
No. They use simplified inputs to teach the method. A real design needs the actual project data and the codes adopted where it is built.
Which code edition is used?
Electrical examples use NEC 2023 table values. Your jurisdiction may have adopted a different edition, so check it.
Do the pages link to calculators?
Yes. Each problem links to the calculator or lab that does the same job. Those tools are part of the All-Access Pass.
Educational material. Examples use simplified, hypothetical inputs and are not a design, a construction document or professional engineering advice. Confirm requirements with the codes and standards adopted where the work is built and with a licensed engineer.
More: Comparisons Β· Troubleshooting Β· Case Studies Β· Exam Study Plans Β· First 90 Days