Why Project Setup Matters More Than You Think
The first hours you spend on a Revit project are the most leveraged. Decisions made during project setup — the coordinate origin, the level structure, the unit precision, the shared parameters — propagate through every view, every sheet, every linked file, and every IFC export for the life of the project. A five-minute shortcut on day one can become a week of rework on day 180 when you realize the model is positioned 20 kilometers from the real site in coordinate space, or that your structural engineer's levels do not match your architectural levels by 100mm.