⚠️
Educational & Preliminary Use Only
Results must be reviewed and stamped by a licensed Electrical Engineer (PE) before use in permit applications. Always verify with the locally adopted edition of the NEC and AHJ amendments. Engage a licensed professional for all permitted work. EngineersUniverse assumes no liability.
1. Project Info
2. Building & Service
3. Subsystem Loads
4. Emergency / Standby
📋 Project Information
Lighting unit load: 3.5 VA/ft² per NEC Table 220.12 (NEC 2023). Classic Table 220.12 values; override allowed via "Other". Demand factors (220.44/.56) and continuous adders (215.2/230.42) applied automatically.