Checklist

Checklist: Before You Submit a Calculation or Drawing for Review

Eight checks to run before you send engineering work for review: scope, inputs and revisions, assumptions, formulas and units, open questions, consistency with related documents, and a revision record.

Templates and checklists · Last reviewed

A reviewer should spend their time on the engineering, not on finding missing units or unclear inputs. Run these checks first.

The checklist

  1. State the task and its limits: what this calculation or drawing covers, and what it does not.
  2. Identify every input source and its revision: drawings, specifications, manufacturer data, codes and their editions.
  3. Show the assumptions. Mark the ones you made yourself and the ones that were given to you.
  4. Show the formulas, with the source (code section, handbook or standard) and the units on every value.
  5. Check the arithmetic a second way: a rough estimate, a different method or a quick sanity check against a similar job.
  6. Make open questions visible. List what is not yet confirmed and who is being asked.
  7. Check consistency with related documents: the calculation against the drawings, the schedules, the specification and the other disciplines.
  8. Record the revision: the date, what changed since the last version, and who reviewed it.

A quick sanity check

Before you send a result, ask whether it is the right size. A 3-phase 480 V motor of 40 hp drawing 520 A should look wrong, because the table value is about 52 A. A result that is off by a factor of ten, or by a factor of √3, is usually a units or formula error that a rough estimate catches.

When the review comes back

  • Answer every comment, even when the answer is "done" or "I disagree, because...".
  • Note which comments came from a missed check, and add that check to your personal checklist.
  • Do not change anything the reviewer did not mention without recording it in the revision note.

Example: a self-check on a voltage drop calculation

  1. Scope: 240 V feeder to a sub-panel; excludes protection and conductor ampacity.
  2. Inputs and revisions: load 50 A from the panel schedule rev C; length 150 ft from the site plan rev B.
  3. Assumptions: K = 12.9 for copper at 75 °C; single-phase; marked as my assumption.
  4. Formula and units: VD = 2 × K × I × L ÷ CM, with the numbers and units written out.
  5. Second method: a rough check against a table of voltage drop per amp per 100 ft agrees within a few percent.
  6. Open question: whether the architect will move the panel, which changes L. Asked on the 14th.
  7. Consistency: the conductor size on the calculation matches the one-line diagram.
  8. Revision record: rev A, issued for review, no earlier version.

Comments reviewers often make

  • The units are missing or inconsistent.
  • The source or revision of an input is not stated.
  • An assumption is buried in the text and not listed.
  • The calculation does not match the drawing.
  • The result is given with more precision than the inputs support.

Related tools and labs

Calculators, labs and simulators are part of the All-Access Pass.

More first 90 days

Questions

Does this replace my company's QA procedure?

No. Follow your company procedure. This is a personal checklist to run before the formal review.

How long should the self-check take?

Usually minutes for a small item. It takes less time than the reviewer would spend finding the same problems.

How many times should I check my own arithmetic?

At least twice, the second time by a different route, such as a rough estimate or a different formula. Two checks by the same method often repeat the same mistake.

What if I disagree with a review comment?

Reply with your reasoning and the source, and ask the reviewer to confirm. A short, polite explanation usually settles it.

Educational material. Examples use simplified, hypothetical inputs and are not a design, a construction document or professional engineering advice. Confirm requirements with the codes and standards adopted where the work is built and with a licensed engineer.