A stacked bar of a 1,660 kW facility: 1,200 kW IT load (72.29%), 360 kW cooling, 50 kW UPS losses, 30 kW distribution losses and 20 kW miscellaneous, giving a power usage effectiveness of 1,660 ÷ 1,200 = 1.383.