Deferred Submittal List

The portions of the design submitted after the permit, such as fire sprinklers or fire alarm. Sheet G-026.

Read the free drawing guide ↓

How to read this drawing

A deferred-submittal list identifies design information intended for a later submission rather than the initial document package. It is a tracking and coordination tool: a listed item still needs defined responsibility, supporting information and the required review before the associated work can proceed.

Follow the relationships

  1. Read each entry as a scope description, not a blanket permission to defer the entire system. Establish what the initial package already defines, what remains to be developed and which interfaces depend on that later work.
  2. Follow responsibility from preparation through professional review, submission and the applicable authority process. Those roles may differ between projects. A document marked submitted is not necessarily reviewed, accepted or released for installation.
  3. Connect the list to the submittal register and current drawing revisions. Track required inputs, dependencies, review status and outstanding comments separately so that a changed layout does not leave a later package based on obsolete information.

Illustrative fire-system package

A fictional project may list a later fire-system package while the initial drawings establish room layouts and coordination zones. A subsequent ceiling change should trigger review of the dependent package and affected disciplines. Listing the package does not establish that deferral is permitted, that a contractor owns all design responsibility or that installation can start.

Use and limitations: Whether deferral is allowed, who must prepare the design and when approval is required depend on the project, contract and adopted requirements. Confirm the actual process with the responsible professionals and authority.