Per-Unit Fault Calculation at a 4.16 kV Bus: 14.61 kA

A 500 MVA utility source (0.02 pu) and a 10 MVA, 7.5% transformer on a 10 MVA base give a total of j0.095 pu, a 1,388 A base current and a 14.61 kA three-phase bolted fault at the 4.16 kV bus, shown with the equivalent circuit.