← Gallery

Selective Coordination: 100 A Downstream and 400 A Upstream Breakers

A time-current plot for a 100 A and a 400 A breaker at a 4,500 A fault on a 480 V system. The downstream breaker clears in 0.016 s and the upstream in 0.100 s, a 0.084 s margin, with the study values listed.

More in Protection, Coordination & Arc Flash