3D Explorers & Inspectors · Included with All-Access

Chemical Manufacturing Facility 3D Explorer

Inspect a fictional specialty-chemical blending and separation facility: tank farm, transfer pumps, jacketed vessels, heat exchange, separation, utilities and control room.

One connected facility, several ways to inspect

Orbit the whole site, zoom into equipment or move between named areas. Reveal all equipment names, show or remove building roofs, trace the colored service routes, and use optional drone-style keyboard navigation. Each selected assembly explains its purpose, inspection questions and dependencies.

The companion instructor-led course adds eight detailed lessons, Cedar voice narration, knowledge checks and two troubleshooting case files. The full explorer and training are included with All-Access; this overview is public.

Equipment you can inspect

  • TK-101 / TK-102 · Feed tank farm

    Segregated feed vessels provide inventory ahead of transfer and batch preparation. Bund walls illustrate secondary containment.

    Compare vessel identification, inventory records, vent arrangements and evidence of containment condition. A tank appearance does not establish compatibility or capacity.

  • P-101A/B · Transfer pump skid

    Duty and standby centrifugal pumps transfer feed along the pipe rack toward the process train.

    Separate motor status from delivered flow. Compare suction conditions, valve position records, current and local versus remote readings.

  • V-201 · Jacketed process vessel

    A jacketed agitated vessel represents a controlled mixing or processing stage, with a platform, drive and separate utility jacket connections.

    Trace the process feed separately from the jacket utility. Compare local temperature with trend quality; no recipe, reaction rate or safe temperature limit is prescribed.

  • E-201 · Shell-and-tube exchanger

    Separate process and utility circuits transfer heat across an exchanger surface without intentional fluid mixing.

    Inspect the two pairs of nozzles, supports and piping. Compare inlet/outlet temperature and flow evidence across both sides.

  • T-301 · Separation column & receiver

    A conceptual separation column with access platforms, overhead piping and a receiver illustrates how different streams can leave one process area.

    Follow overhead and product routes, identify the sampling boundary and compare pressure/temperature evidence. The model does not identify a real separation recipe.

  • TK-401 · Product storage & loading

    Finished-material storage and a loading canopy separate production from dispatch and product-release decisions.

    Check material identity, transfer records and containment observations; appearance alone cannot establish product quality or release status.

  • U-001 · Cooling, air & electrical services

    Cooling cells, circulation pumps, an air receiver and electrical cabinets support the manufacturing process.

    Compare common utility dependencies before assuming several process alarms are unrelated. Trace supply and return as separate pipes.

  • CR-001 · Control & operator building

    Operator consoles, control cabinets and event records provide supervisory visibility into the process.

    Record timestamp, signal quality and source. A screen value is evidence about a measurement path, not proof of physical condition.

Teaching model and limits

Fictional teaching facility, not a process design, verified digital twin or operating procedure. Routes represent functional connections; no chemical reaction, relief sizing, hazardous-area classification, dispersion or process safety calculation is performed.

Camera access, decorative motion and visible connections do not demonstrate real operating clearance, equipment readiness or safety. Use the course references and asset-specific documents for further learning.

Start instructor-led training · Related engineering studio · Browse all training