Asset maintenance plan
Track a task with manufacturer instructions, access and service coordination.
- Maintenance task
- Manufacturer / maintenance-plan reference
- Target date
- Isolation / service coordination
FIELD RECORDS · FOLLOW-UP · REVIEW
Register PV and storage assets, retain inspection and maintenance records, and compare entered energy data under explicit measurement boundaries.
Register PV and storage assets, retain inspection and maintenance records, and compare entered energy data under explicit measurement boundaries. It is designed for PV/storage O&M technicians, asset managers and facility energy teams. Use it before a visit to prepare the scope, during documentation to retain actual observations, and afterward to track follow-up and reviewed reporting.
Track a task with manufacturer instructions, access and service coordination.
Compare energy for the same duration and measurement boundary. A difference is not weather-normalized degradation.
Client and site details, equipment register, scoped visits, explicit outcomes, findings, repair estimates, evidence photographs, independent retests and retained reviewed report versions.
Reading fields: Recorded period energy (kWh); Recorded state of charge (%); Recorded temperature (°C); Recorded power (kW); Period, meter boundary and weather / operating context. Blank values remain unmeasured, and the operator chooses each outcome explicitly against the declared project basis.
Included with the same website All-Access. Guides are public; the operational workspace requires your pass. Each discipline has separate browser-local records and backup files. No cloud synchronization, shared company login or external notification is included. Export backups before clearing site data or changing devices.
A fictional PV system records 420 kWh against a 500 kWh comparison period: −80 kWh, or −16%. Record equal duration and meter boundary plus weather, curtailment and downtime context; this is not proof of degradation or a battery efficiency measurement.
Draft and retained reviewed PDF reports include company/client/site information, declared visit scope, equipment, readings and observation history, missing or inaccessible outcomes, open findings, discipline records at the site, evidence photographs and review attribution. Repair estimates have separate PDF reports. JSON files are complete backups, not the activity summary.
No remote battery control, state-of-health diagnosis, weather-normalized yield model, thermal-runaway prediction or automatic acceptance thresholds.
Entered names indicate attribution, not authenticated signatures. Review does not automatically close findings or certify compliance. Discipline-log completion does not replace a passed repair retest, functional test or required professional approval. Original report snapshots remain unchanged when live records are updated.
No. This uses the same website pass as the other workspaces, workbenches and instructor-led training.
No. This version saves records and normalized photographs in the current browser. Back up and restore deliberately; independent copies do not merge. Browser storage can be lost or unavailable. Keep backup files private because they contain client information.
No. Qualified users enter actual readings and outcomes under their approved procedures. Preparation prompts are original record templates, not complete inspection instructions or official standard forms.
Published and reviewed November 23, 2026.