Define a shared AC boundary
PV DC nameplate is multiplied by an entered derate and a fixed clear-day production shape. Load is constant for 08:00–18:00 and separately constant for the other hours. Each interval is one hour, so interval kW and kWh have the same numeric value. This shape is illustrative rather than downloaded weather data.
Track stored energy with losses
Round-trip efficiency is split into equal square-root charge and discharge efficiencies. Charging is limited by surplus PV, AC power limit and available storage headroom. Discharging is limited by deficit, power and stored energy above minimum SOC. Stored energy rises by charge input × efficiency and falls by delivered discharge / efficiency.
Model the outage as a different boundary
Outside outage hours the grid serves residual deficits and receives surplus. During outage hours grid exchange is zero: excess becomes curtailed energy and insufficient supply becomes unmet demand. The outage window must fit within the modeled day. No grid charging or forecast-based optimization is used.
Avoid misleading savings claims
Reported cost is import kWh times a flat energy tariff, with no export credit, demand charge or investment cost. Compare final SOC as well as imports, because a scenario can consume energy that was already in the battery at the start. Real assessment needs weather, load history, degradation and equipment limits.
Worked example
- For 120 kWh capacity at 50% initial SOC, stored energy begins at 60 kWh. A 15% minimum permits 42 kWh to leave storage before reaching the floor.
- At 90% round-trip efficiency, each leg is √0.9 = 94.868%. That 42 kWh storage decrease can deliver about 39.845 kWh to the AC bus, subject to the hourly power limit.
- An 80 kW DC array with 0.85 derate produces 68 kW at the peak of this illustrative shape. Evening outage demand is served only by the PV and stored energy available in those particular hours; shortages remain visible.
Questions and interpretation
Why does the first day depend on initial SOC?
Stored energy at the start can supply loads. The final SOC is reported so the comparison does not hide that energy contribution.
Does an outage simulation mean the equipment can island?
No. Island-capable inverter, transfer arrangements, protection and startup capability must be validated separately.
Is this an annual solar forecast?
No. It uses one fixed illustrative day. Use measured load data and site weather with a detailed model for annual planning.
Prepare an activity report
Use View / print study report to review a clean summary of your activity, then print it or save a PDF. Download study report (PDF) creates a formatted document with the actual assumptions, results, interpretation and references. Charts and baseline comparisons are included where applicable; security reports summarize recorded runs. Website navigation, purchase panels and unrelated page content are excluded.
References and verification
The linked sources explain the background. The interactive calculations and scenarios are original teaching exercises with explicit assumptions, not certified equipment selection, measured performance or a real security assessment.
Continue the study
Explore the other workbenches
- Electrical Distribution & Protection Workbench
- HVAC System & Energy Workbench
- Pump & Piping System Workbench
- Fire Alarm System Design Workbench
- Motor & Drive Selection Workbench
- Structural Beam & Load Path Workbench
- SCADA & Control Loop Workbench
- GPU Memory / VRAM Sizing Calculator
- 800 VDC Power Architecture Explorer
- AI Agent Identity & Security Lab
- Data-Center Water & Energy Comparison
- Inside a Liquid-Cooling System / CDU