← Gallery

Data Center Design Summary Dashboard: Power Path, UPS and PUE

A summary of a 1,600 kW dual-corded data center on a 34.5 kV utility with two 2,500 kVA transformers, 2 × (4 × 400 kW) UPS, 2,216.7 kW facility power (PUE 1.385), 2,333 kVA utility demand and a 52.3 kA transformer-only fault, in a flow and design table.

More in Data Centers