Connect supply flow, pressure and drainage functions without treating examples as design criteria.
Free · No sign-in required3 lessonsWorked examples & practiceBeginner
0 of 3 lessons checked · Progress is saved in this browser.
01 / SYSTEM VIEWSupply
02 / SYSTEM VIEWFixtures
03 / SYSTEM VIEWDrainage and venting
This map connects the course ideas; it is not a detailed engineering schematic.
LESSON 1 / 3 · FREE
Flow versus pressure
Your goal: Distinguish a volume rate from a pressure measurement.
Understand the idea
Water supply must provide both a needed flow and adequate pressure under operating conditions. Static pressure describes a no-flow condition, not the complete supply characteristic. Units matter: liters per minute cannot be added to kilopascals. Demand depends on use and diversity, not simply the number of fixtures.
Worked example
A fictional test collects 12 liters in 30 seconds. Measured flow is 24 L/min during that test; this does not establish every simultaneous-demand condition.
Try it yourself
A test collects 10 liters in 20 seconds. Calculate flow in L/min.
Your goal: Use continuity with explicitly supplied pipe area.
Understand the idea
For steady incompressible flow, mean velocity equals volume flow divided by internal area. Diameter labels are not always internal diameters. A velocity calculation alone cannot establish acceptable noise, pressure loss or code-compliant pipe sizing.
Worked example
For Q = 0.001 m³/s and internal area 0.0005 m², velocity is 2 m/s. The given area is a teaching input.
Try it yourself
At Q = 0.0015 m³/s and A = 0.0005 m², find mean velocity.
Your goal: Interpret a supplied geometric slope without selecting one for construction.
Understand the idea
Drainage, venting and potable supply serve different functions. A vent helps manage pressure and protect trap seals; it does not turn drainage piping into a pressure supply. Geometric slope is fall divided by run, but acceptable slopes and arrangements depend on applicable design requirements.
Worked example
A fictional pipe falls 0.1 m over 5 m of horizontal run. Its geometric slope is 2 percent; this example is not a required drainage slope.
Try it yourself
Calculate percentage slope for a supplied 0.12 m fall over 6 m run.
Explain each worked example in your own words, check the units and identify one assumption that could change the result. Then use the linked labs or roadmap to apply the ideas to a broader task.
Practice progress is a study aid, not a professional qualification or proof of field competence.
Continue in Plumbing
Apply these foundations in an available course, lab or roadmap. The linked resource’s access rules still apply.
These original lessons use simplified models and explicitly supplied practice values. Calculations teach concepts; they do not select real equipment, establish code compliance or authorize field work. Follow the linked references and advanced resources for deeper study.
Updated · Study progress stays in this browser. There is no certificate or paid gate for these lessons.