What changed in the National Electrical Code's 2026 edition, based on a state code-review committee's published summary, written in our own words for electricians, engineers and inspectors. Not a substitute for the NFPA 70 text.
Adoption status: the NEC is a model code with no legal force until a state or local jurisdiction adopts it. Per NFPA figures reported by EC&M, as of October 1, 2025, 20 states had completed their 2023 NEC update, a number of states were still on 2020, 2017 or older editions, and no state had started the process to adopt the 2026 edition. Local amendments are common, so confirm the edition with the authority having jurisdiction. NFPA offers free read-only access to the 2026 NEC.
In the 2026 NEC the load calculation article moves from Article 220 to Article 120, and it now lets a listed power control system that manages loads such as EV charging be used to size a service or feeder. Projects under the 2023 and earlier editions keep citing Article 220, so cite the edition with the article number.
| Article | Topic |
|---|---|
| Article 120 (was 220) | Load calculations renumbered, with new power control systems |
| Article 130 (new) | Energy management systems and power control systems |
| Article 110 | Arc-flash labels and equipment working space |
| Article 210 | GFCI classes, the 60 A threshold and AFCI extensions |
| Articles 225 and 230 | Emergency disconnects and their labels |
| Article 250 | Ground rods, GEC splices and cable armor |
| Article 310 | Copper-clad aluminum and neutral clarification |
| Article 480 | Stationary batteries |
| Articles 265 and 495 | Medium-voltage equipment listing dates |
| Articles 408 and 517 | Panelboard labels and healthcare microgrids |
| Code structure | The reorganization previewed for 2029 |
Source: Minnesota Department of Labor and Industry committee minutes of Sept. 25, 2025 on the 2026 NEC (Articles 90 through 547 only). The detail for each change, what it means in practice and the update checklist continue below.
| Article | Topic | What changed |
|---|---|---|
| Article 120 (was 220) | Load calculations renumbered, with new power control systems | The load calculation article moves from Article 220 to Article 120. It introduces Power Control Systems (PCS) and Energy Management Systems (EMS): under 120.7, a listed PCS that controls loads such as EV charging equipment can now be used to determine the size of a service or feeder. RV park calculations move to 120.30 from Article 551, and the healthcare facility calculations are revised. |
| Article 130 (new) | Energy management systems and power control systems | A new article in two parts: Part 1 covers energy management systems and Part 2 covers power control systems. The committee notes that UL 916 applies to energy management systems and that a new standard for power control systems, UL 3141, is being developed. |
| Article 110 | Arc-flash labels and equipment working space | 110.16 now requires arc-flash labeling on equipment in all non-dwelling occupancies regardless of amperage. The label must show the nominal voltage, the arc-flash boundary, the incident energy or PPE category, and a date. 110.3(B) states that manufacturer instructions cannot be less than the prescriptive NEC safety requirements. 110.26(C)(2) now applies to feeder equipment, not only service equipment, when side-by-side equipment totals 1200 A or more and is 6 ft wide or wider. |
| Article 210 | GFCI classes, the 60 A threshold and AFCI extensions | 210.8 defines new GFCI-type classes (C, D and E) and reaffirms Class A for personal protection. In 210.8(F) the amperage threshold rises from 50 A to 60 A for single-phase branch circuits rated 150 V or less to ground, with a new exception for listed HVAC equipment protected by a Class C SPGFCI. 210.12(E) allows AFCI protection for an extended or modified dwelling branch circuit to be provided at the first switch. A new informational note covers high-frequency breakers to reduce nuisance tripping on equipment that changes frequency. |
| Articles 225 and 230 | Emergency disconnects and their labels | 225.31(A): emergency disconnects for outside feeders must be within sight (50 ft or less), and a second disconnect is required at the nearest point of entry if the emergency disconnect is off the building. 230.70(A)(1): for one- and two-family dwellings, the service disconnect must be in a readily accessible outdoor location on the dwelling or within sight. 230.70(D): the label reads "Emergency Disconnect" in white text on a red background, 1/2 in. high, and other power sources (such as solar or a generator) not at that disconnect must be listed on a plaque or directory showing their location. |
| Article 250 | Ground rods, GEC splices and cable armor | 250.53(A)(4): a rod or pipe electrode is first driven vertically to a depth of 8 ft unless that is not feasible, and the installation options are put in order. 250.64(C): grounding electrode conductors may be spliced with listed grounding and bonding equipment when accessible. 250.64(E)(1): ferrous cable armor is added, so it is bonded at both ends like raceways. |
| Article 310 | Copper-clad aluminum and neutral clarification | 310.5(A): copper-clad aluminum conductors are recognized and added to the ampacity tables. 310.15(E): the neutral conductor section is reformatted into a list that defines when a neutral counts as a current-carrying conductor. |
| Article 480 | Stationary batteries | 480.1: the word "standby" is deleted from the scope, so the article applies to all stationary batteries. 480.14 requires overcharge control for all stationary batteries, to prevent fires, thermal runaway and equipment failure. |
| Articles 265 and 495 | Medium-voltage equipment listing dates | 495.2 introduces listing requirements for medium-voltage equipment: equipment of 15 kV or less by Jan. 1, 2029, and 15 kV to 52 kV by Jan. 1, 2032, delayed because the testing infrastructure is not yet available. 265.19 covers conductor sizing and ampacity for supervised industrial installations above 1000 V AC or 1500 V DC, which may be determined by engineering supervision. |
| Articles 408 and 517 | Panelboard labels and healthcare microgrids | 408.10(F): panelboard labels must now be placed on the front of the enclosure rather than inside. 517.4: microgrids are now allowed as the primary power source in healthcare facilities, with capacity sizing based on historical data or connected load. 517.26: Article 700 is removed and emergency system requirements are integrated into Article 517. |
| Code structure | The reorganization previewed for 2029 | The committee notes the NEC will expand from 9 to 22 or more chapters in the 2029 edition. Placeholder articles were added in 2026 to prepare for this, many medium-voltage articles were added to support a new Chapter 3, Chapter 8 (communications) loses its independent status with most of its requirements moving into Chapter 7, and the new structure is previewed in Annex L of the 2026 NEC. |
Source: the Minnesota Department of Labor and Industry NEC 2026 Adoption Review Committee minutes of Sept. 25, 2025, which summarize an IAEI presentation of the 2026 changes. Those minutes stop at Article 547, so this page does not cover Articles 550 onward, including Article 690 (solar PV), 705 (interconnected power sources) and 706 (energy storage). Reports of changes to those articles, such as to rapid shutdown, conflict between sources, so read the NFPA 70 text for them. This is our summary, not a line-by-line comparison of the code.
The load calculation article moves from Article 220 to Article 120. It introduces Power Control Systems (PCS) and Energy Management Systems (EMS): under 120.7, a listed PCS that controls loads such as EV charging equipment can now be used to determine the size of a service or feeder. RV park calculations move to 120.30 from Article 551, and the healthcare facility calculations are revised.
Any calculation, spreadsheet or drawing note that cites "NEC 220" needs the new article number on a project designed under the 2026 edition. "NEC 220" is still the right citation for the 2023 and earlier editions, so cite the edition together with the article.
A new article in two parts: Part 1 covers energy management systems and Part 2 covers power control systems. The committee notes that UL 916 applies to energy management systems and that a new standard for power control systems, UL 3141, is being developed.
If a design relies on load management to downsize a service (common with EV charging), the 2026 code now has a dedicated place for the rules, and the equipment has to be listed for that purpose.
110.16 now requires arc-flash labeling on equipment in all non-dwelling occupancies regardless of amperage. The label must show the nominal voltage, the arc-flash boundary, the incident energy or PPE category, and a date. 110.3(B) states that manufacturer instructions cannot be less than the prescriptive NEC safety requirements. 110.26(C)(2) now applies to feeder equipment, not only service equipment, when side-by-side equipment totals 1200 A or more and is 6 ft wide or wider.
Labeling scope grows from larger equipment to every non-dwelling installation, so small commercial panels and disconnects are now in scope. It also raises the question of who supplies the incident-energy values, which usually means an arc-flash study.
210.8 defines new GFCI-type classes (C, D and E) and reaffirms Class A for personal protection. In 210.8(F) the amperage threshold rises from 50 A to 60 A for single-phase branch circuits rated 150 V or less to ground, with a new exception for listed HVAC equipment protected by a Class C SPGFCI. 210.12(E) allows AFCI protection for an extended or modified dwelling branch circuit to be provided at the first switch. A new informational note covers high-frequency breakers to reduce nuisance tripping on equipment that changes frequency.
Circuits at 50 to 60 A (ranges, HVAC, some EV charging) are treated differently from the 2023 edition, so branch-circuit schedules copied from an older project need re-checking.
225.31(A): emergency disconnects for outside feeders must be within sight (50 ft or less), and a second disconnect is required at the nearest point of entry if the emergency disconnect is off the building. 230.70(A)(1): for one- and two-family dwellings, the service disconnect must be in a readily accessible outdoor location on the dwelling or within sight. 230.70(D): the label reads "Emergency Disconnect" in white text on a red background, 1/2 in. high, and other power sources (such as solar or a generator) not at that disconnect must be listed on a plaque or directory showing their location.
Services that have solar, storage or a generator now need the plaque and directory work in the design package, not just the disconnect.
250.53(A)(4): a rod or pipe electrode is first driven vertically to a depth of 8 ft unless that is not feasible, and the installation options are put in order. 250.64(C): grounding electrode conductors may be spliced with listed grounding and bonding equipment when accessible. 250.64(E)(1): ferrous cable armor is added, so it is bonded at both ends like raceways.
These change installation details and inspection checklists more than design calculations, but they show up as specification and detail-sheet notes.
310.5(A): copper-clad aluminum conductors are recognized and added to the ampacity tables. 310.15(E): the neutral conductor section is reformatted into a list that defines when a neutral counts as a current-carrying conductor.
Ampacity and wire-size tools that use the 2023 tables are not wrong for 2023 projects, but a 2026 design can now use a conductor type those tables do not list.
480.1: the word "standby" is deleted from the scope, so the article applies to all stationary batteries. 480.14 requires overcharge control for all stationary batteries, to prevent fires, thermal runaway and equipment failure.
Battery installations that were treated as outside Article 480 because they were not standby systems are now inside its scope.
495.2 introduces listing requirements for medium-voltage equipment: equipment of 15 kV or less by Jan. 1, 2029, and 15 kV to 52 kV by Jan. 1, 2032, delayed because the testing infrastructure is not yet available. 265.19 covers conductor sizing and ampacity for supervised industrial installations above 1000 V AC or 1500 V DC, which may be determined by engineering supervision.
Medium-voltage procurement in the next few years should track the listing dates, since unlisted equipment becomes harder to specify after them.
408.10(F): panelboard labels must now be placed on the front of the enclosure rather than inside. 517.4: microgrids are now allowed as the primary power source in healthcare facilities, with capacity sizing based on historical data or connected load. 517.26: Article 700 is removed and emergency system requirements are integrated into Article 517.
The panel schedule label location changes on every new panel. Healthcare designers get a code route for microgrid-based primary power.
The committee notes the NEC will expand from 9 to 22 or more chapters in the 2029 edition. Placeholder articles were added in 2026 to prepare for this, many medium-voltage articles were added to support a new Chapter 3, Chapter 8 (communications) loses its independent status with most of its requirements moving into Chapter 7, and the new structure is previewed in Annex L of the 2026 NEC.
Article numbers will move again in 2029, so cite the edition and the section number together in drawings and calculations.
This page summarizes the changes in the 2026 edition of the National Electrical Code (NFPA 70) that were listed in a state code-review committee's published minutes, in our own words. The biggest practical change for calculation work is that the load calculation article moves from Article 220 to Article 120. It is an educational summary and not a substitute for the official NFPA 70 text, a code-change analysis service or advice from your authority having jurisdiction.
The changes above come from committee minutes that summarize an IAEI presentation and stop at Article 547. Articles 550 onward, including Article 690 (solar PV), 705 (interconnected power sources) and 706 (energy storage), are not covered here, and published reports about changes to those articles, such as to rapid shutdown, conflict with one another. For those articles read the NFPA 70 text directly. NFPA offers free read-only access to the 2026 edition.
The NEC revises on a three-year cycle. A design that was compliant when drawn is not automatically compliant if the project is re-permitted, redesigned, or reused as a template under a newer edition. The 2026 renumbering of the load calculation article from 220 to 120 also means calculations, spreadsheets and drawing notes need their citations checked, and the edition should be cited with the article number.
The NEC has no legal force until a state or local jurisdiction adopts it, and the edition in force is the one your authority having jurisdiction has adopted, including local amendments. The 2026 edition was released in August 2025. As of October 1, 2025, NFPA reported 20 states had completed their 2023 update and none had started the process for 2026. Check with the local building or electrical authority before design.
Yes. According to the committee minutes, the load calculation article moves from Article 220 to Article 120. It also introduces power control systems and energy management systems, and relocates RV park calculations to 120.30. Use "NEC 220" for projects under the 2023 or earlier editions and Article 120 for projects designed under the 2026 edition.
Probably not yet. The NEC is a model code with no legal authority until a state or local jurisdiction adopts it. As of October 1, 2025, NFPA reported that no state had started the process to adopt the 2026 edition. Confirm the edition and any local amendments with your authority having jurisdiction.
According to the committee minutes, 110.16 now requires arc-flash labeling on equipment in all non-dwelling occupancies regardless of amperage. The label shows the nominal voltage, arc-flash boundary, incident energy or PPE category, and a date.
NFPA provides free read-only access to NFPA 70 on its website, and the full text can be purchased there. This page is a summary, so use the official text for compliance decisions.
No. The source minutes stop at Article 547, and reports on changes to Articles 690, 705 and 706 conflict between sources. Read the NFPA 70 text for those articles.
At minimum, whenever a project is re-permitted, significantly revised, or used as a template for a new project. Cite the edition together with the section number so the next change is easy to trace.