A full professional engineering curriculum for GPU-scale AI infrastructure — 25 modules and 8 complete real-facility design packages, with worked calculations, drawings, field documentation, and a certificate of completion.
25 modules in 5 phases, with worked examples, interactive tools, labs and a quiz in every one, and a certificate of completion.
Connect rack loads, cooling and capacity assumptions.
The project brief is deceptively simple on paper: take one hall inside an existing 5 MW enterprise colocation facility, currently running legacy air-cooled racks at an 8 kW/rack average (roughly 62.5 racks/MW at typical 1.15 PUE overhead), and carve out capacity for a new AI tenant requiring liquid-cooled pods at 60 kW/rack — a 7.5x density increase per rack footprint. The hall in question is roughly 12,000 sq ft,…
Selected training excerpt, not a complete design or a project submission. The full project includes its assumptions, methods and checks.
Build your own phase-by-phase workbook, record the evidence behind your decisions and download your work.
Estimate the daily energy needed by an equipment load. Change the power and operating hours, then check your estimate.
Daily energy = power × operating hours
Constant electrical input power; startup, standby and changing operating loads are excluded. This free exercise does not mark a paid module complete.
Related full-program tool: Data Center Power Path lab →Choose a phase to explore its lessons and project work.
Start with the free lesson →Covers Introduction to AI Data Center Engineering, Codes & Standards, Power Delivery Architecture, Cooling Technologies and GPU Cluster Network Fabric.
Why AI/GPU data centers are a distinct engineering discipline — power, cooling, and network fabric as one interacting system.
NFPA 76, ASHRAE TC9.9, Uptime Institute Tiers, and NEC Article 645.
Utility service through UPS, PDUs, and busway distribution to the rack.
Rear-door heat exchangers, direct-to-chip, immersion cooling, and CDU architecture.
InfiniBand vs. RoCE, leaf-spine topology, and physical layout implications.
Project checkpoint: Record the assumptions, calculations and evidence behind this phase’s outcome in your project workbook.
Covers Rack Power Density Design, Electrical Calculations, Cooling Load Calculations, Grid Interconnection & On-Site Generation and Redundancy & Availability.
From GPU server specs to a completed PDU circuit schedule.
Worked examples — UPS sizing, voltage drop, and generator step-load.
Worked examples — cooling tons, liquid/air split, CDU flow rate.
Utility interconnection studies and on-site generation as a capacity bridge.
N+1 vs. 2N architecture and the cost/availability tradeoff.
Project checkpoint: Record the assumptions, calculations and evidence behind this phase’s outcome in your project workbook.
Covers Drawings, Installation & Commissioning, Monitoring & DCIM, Troubleshooting and Efficiency Metrics & Reporting.
One-line diagrams, cooling P&IDs, rack elevations, and white-space plans.
Field practices, leak-detection installation, and load-bank testing.
DCIM point design, real-time PUE/WUE, and capacity planning data.
9 real diagnostic scenarios with symptoms, diagnosis, and resolution.
PUE, WUE, and CUE calculation, and building a defensible efficiency report.
Project checkpoint: Record the assumptions, calculations and evidence behind this phase’s outcome in your project workbook.
You apply what you have learned to 8 complete designs, starting with Colocation Retrofit for AI Workloads.
Retrofitting a 5 MW enterprise colo to support a 60 kW/rack liquid-cooled AI tenant.
A 150 MW greenfield AI training campus with on-site substation and generation.
A 500 kW edge inference facility co-located at a telecom central office.
Converting an air-cooled 2 MW hall to direct-to-chip liquid cooling.
A modular 1 MW facility using prefabricated power/cooling skids.
An 800 kW research cluster built into existing campus infrastructure.
A 300 kW private cluster for proprietary training inside corporate IT space.
A purpose-built multi-tenant facility with shared central utility plant.
Project checkpoint: Record the assumptions, calculations and evidence behind this phase’s outcome in your project workbook.
Covers Professional Documentation and Practice & Certification.
A downloadable kit of 12 real project templates.
A final design assignment, a comprehensive exam, and your certificate of completion.
Project checkpoint: Record the assumptions, calculations and evidence behind this phase’s outcome in your project workbook.
By the end: Covers Introduction to AI Data Center Engineering, Codes & Standards, Power Delivery Architecture, Cooling Technologies and GPU Cluster Network Fabric.
AI data center planning workbook: Connect rack loads, cooling and capacity assumptions. Keep a result and a verification note for each phase.
All-Access includes the project workbook, lesson notes, self-review checklists and portfolio downloads. Try the free lesson above to see a worked example.
Your name
AI Data Center Engineering Professional Training ProgramEngineersUniverse · self-paced learning
Finish all required module quizzes to unlock your certificate of completion. Modules with a score requirement must meet that requirement. Your project portfolio and skills summary are separate downloads for your own learning record.
A certificate of completion is not a professional license or accreditation.
12 real project templates — rack power/cooling schedule, PDU circuit schedule, CDU commissioning checklist, leak-detection test report, PUE/WUE calculation worksheet, generator load-bank test report, DCIM alarm response runbook, capacity planning worksheet, as-built documentation checklist, change order, RFI, and punch list. Available for download from Module 24 (Professional Documentation) once you've unlocked the program.