With the 2000A service and distribution architecture set in Step 2, this step sizes the actual conductors — floor feeders, the chiller feeder, and the elevator feeder — per NEC 310.15 ampacity and Chapter 9 conduit fill.
With the 2000A service and distribution architecture set in Step 2, this step sizes the actual conductors — floor feeders, the chiller feeder, and the elevator feeder — per NEC 310.15 ampacity and Chapter 9 conduit fill.