Given
A fire-water tank must supply a combined demand of 750 gpm (for example, sprinklers plus hose streams) for 90 minutes. Treat the demand and duration as exercise inputs: the required values come from the applicable standard, the hazard classification and the authority having jurisdiction. The tank has 4,500 gal of unusable water below the suction outlet and 3,000 gal of unusable volume above the working water level (air gap and freeboard). The tank is a vertical cylinder of 30 ft diameter. Assume no refill during the event.
Find
The required water volume, the total tank volume to the overflow level, and the water depth.
Solution
Related tools and labs
Calculators, labs and simulators are part of the All-Access Pass.
More worked problems
- Sprinkler Flow from K-Factor and Pressure
- Fire Alarm Control Panel Battery Calculation
- Fire Alarm NAC Voltage Drop with Distributed Devices
- Sprinkler Branch Line: Work Back from the Remote Head
- Fire Pump Duty: Flow, Pressure and Elevation
- Challenge: Can You Add Two Sprinkler Pressures?
- Size the Branch Circuit for a 40 hp, 460 V Motor
- Voltage Drop on a 240 V Single-Phase Feeder
Questions
Is 90 minutes a standard duration?
It is an exercise value. Durations in standards vary with the hazard, and some occupancies need less or much more.
Why is there unusable water?
The suction outlet sits above the floor to avoid sediment and vortices, and a tank cannot be filled completely up to the overflow because of the air gap and the level control.
How does tank size relate to pump size?
The pump sets the flow rate (here 750 gpm). The tank sets how long that flow can be maintained.
Educational material. Examples use simplified, hypothetical inputs and are not a design, a construction document or professional engineering advice. Confirm requirements with the codes and standards adopted where the work is built and with a licensed engineer.