Stormwater Runoff Using the Rational Method
Estimate peak runoff for a 3.5 acre catchment with Q = CiA, show the unit conversion to cfs, and explain why duration equals time of concentration.
Civil & Structural · Last reviewed
Given
A small catchment of A = 3.5 acres with a composite runoff coefficient C = 0.70. The time of concentration is 15 minutes, and the design rainfall intensity for a 15-minute duration is i = 4.2 in/hr (supplied from a local intensity-duration table).
Find
The peak runoff rate in cubic feet per second, with the unit conversion shown, and the effect of a longer duration.
Solution
Related tools and labs
Calculators, labs and simulators are part of the All-Access Pass.
More worked problems
- Simply Supported Beam: Reactions, Moment and Deflection
- Cantilever Beam: Tip Load and Deflection
- Column Buckling: Why End Conditions Matter
- Footing Bearing Pressure with an Eccentric Load
- Earthwork Cut and Fill by the Average-End-Area Method
- Size the Branch Circuit for a 40 hp, 460 V Motor
- Voltage Drop on a 240 V Single-Phase Feeder
- Pump Head, Shaft Power and Motor Size
Questions
Where does the intensity come from?
From the local intensity-duration-frequency data for the chosen return period, such as 10 years. The value here is supplied for the exercise.
What does C represent?
The fraction of rainfall that becomes runoff at the peak. It is higher for pavement and roofs and lower for lawns and woods, and it rises for large storms.
Does this give the volume of runoff?
No. It gives the peak rate only. A hydrograph method is needed for volume and routing through a pond.
Educational material. Examples use simplified, hypothetical inputs and are not a design, a construction document or professional engineering advice. Confirm requirements with the codes and standards adopted where the work is built and with a licensed engineer.