Compare equivalent boundaries
Useful output is held equal at the point-of-load boundary. Cooling, utility substations, standby-system availability and upstream distribution outside the shown path are excluded. Each architecture uses four lumped stages so that input power, useful output and losses can be compared. The values are illustrative operating-point assumptions, not field measurements or vendor ratings.
Work backward through conversion stages
For each stage, required input = output ÷ efficiency, and loss = input − output. Work backward from useful output to avoid applying every loss to the same load. Overall efficiency is the product of the stage efficiencies. A small change near the load propagates upstream, because preceding stages must also supply that downstream loss.
Read AC and DC currents at their stated locations
The balanced three-phase AC input uses line-to-line voltage and power factor: I = P ÷ (√3 × VLL × PF). The DC result is the row-bus load entering rack conversion divided by the DC voltage. These currents describe different stated boundaries and conductor arrangements; comparing their magnitudes alone does not establish cable size, copper savings or safe switching capacity.
Distribution and protection still need an engineered design
The DC loop sensitivity uses I²R for an entered total outgoing-plus-return resistance. It is displayed separately and is not added again to the already assumed distribution efficiency. It omits temperature dependence, fault behavior, transients and selectivity. DC interruption, isolation, earthing, touch protection and maintenance arrangements require the applicable standards, equipment data and an engineered design.
Architecture roadmaps are not product approvals
The hybrid and native DC paths illustrate different conversion boundaries, not interchangeable installations. Published industry roadmaps describe staged deployment and future concepts. Check the current supplier documentation, applicable codes and availability for a real project rather than treating this diagram as a construction drawing.
Worked example
- For 1,000 kW useful output and four stage efficiencies of 98%, input is 1,000 ÷ 0.98⁴ = 1,084.166 kW. Total conversion/distribution loss is 84.166 kW.
- A separate 1,000 kW DC bus at 800 V carries 1,250 A. A hypothetical 1 mΩ total loop resistance dissipates 1.5625 kW. This is a sensitivity example, not a conductor rating.
- Change one stage at a time and keep the load boundary fixed. A DC path can perform worse if its actual components or operating points have lower efficiencies.
Questions and interpretation
Is 800 VDC always more efficient?
No. Efficiency depends on the actual stage count, component performance, operating load and boundaries. All three paths use editable assumptions.
Does the diagram establish an N+1 or 2N design?
No. Availability and redundancy are separate design properties. This single-path energy budget does not model a failure or maintenance event.
Can I use the current result to select a breaker?
No. Fault duty, interruption capability, earthing, voltage rating, coordination and the full installation context are not modeled.
References and verification
The linked sources explain the background. The interactive calculations and scenarios are original teaching exercises with explicit assumptions, not certified equipment selection, measured performance or a real security assessment.