The 12-template downloadable kit behind every document this program has referenced by name — sizing worksheets, verification and certification documents, and project coordination and closeout records — and how each one is actually used across this program's 5 real projects.
A plumbing engineer's actual deliverable is rarely just a working system — it is the record proving a specific fixture count, pipe size, or field test result was made deliberately, so a plan reviewer, a contractor, an inspector, or a future engineer can trust the system without re-deriving every decision from scratch. This module collects the twelve templates referenced throughout Modules 1 through 19 and this program's five real projects — a Fixture Unit Takeoff Worksheet, a Pipe & Riser Sizing Calculation Sheet, a Grease Interceptor Sizing Worksheet, a Backflow Preventer Test & Certification Report, a Medical Gas System Verification & Certification Log, a Water Supply & DWV Pressure/Leak Test Report, a Riser & Pressure-Zone Diagram Checklist, a Fixture Schedule Template, a Submittal Log, an RFI Template, a Punch List Template, and an As-Built & Commissioning Documentation Checklist — organized into three groups that follow a real project's timeline.
Each template is explained here in terms of what it is for and how it is actually used across this program's five real projects, not reproduced as a blank form — the templates themselves are separate downloadable PDF files. Module 21's capstone assignment applies a working subset of this kit to a brand-new design problem.