Short-Circuit Current at a Transformer Secondary
Estimate the available fault current on the secondary of a 500 kVA, 480 V transformer with 5.75% impedance, assuming an infinite bus.
Electrical & Power · Last reviewed
Given
500 kVA, 3-phase transformer, 480 V secondary, nameplate impedance 5.75%. Assume the utility source is an infinite bus (it does not limit the current), which gives a conservative upper estimate.
Find
The available three-phase fault current at the secondary terminals, and what it means for equipment ratings.
Solution
Related tools and labs
Calculators, labs and simulators are part of the All-Access Pass.
More worked problems
- Size the Branch Circuit for a 40 hp, 460 V Motor
- Voltage Drop on a 240 V Single-Phase Feeder
- Office Lighting Load: Connected Power and Current
- Challenge: The Current That Looks Too High
- Size a Three-Phase Transformer for a Mixed Load
- Power Factor Correction: How Many kvar of Capacitors?
- Pump Head, Shaft Power and Motor Size
- Sensible Cooling Capacity from Airflow and Temperature Difference
Questions
Why assume an infinite bus?
It needs no utility data and always gives a result at or above the real value, so it is a safe first estimate. A real study uses the utility's available fault level.
Does this apply to single-phase transformers?
The same idea applies, with the single-phase full-load current: kVA × 1000 ÷ V.
What is the difference between available fault current and an AIC rating?
The available fault current is what the system can deliver at a point. The AIC (interrupting) rating is what a device can safely interrupt. The rating must be at or above the available current.
How does motor contribution change the result?
Running motors act as generators for the first few cycles of a fault and add current. A full study includes them.
What does a short-circuit study include?
Utility source data, transformer and cable impedances, motor contributions, and device ratings, followed by a check that every device is rated for the current at its location. A coordination and arc-flash study often follows.
Educational material. Examples use simplified, hypothetical inputs and are not a design, a construction document or professional engineering advice. Confirm requirements with the codes and standards adopted where the work is built and with a licensed engineer.