UPS Runtime: Energy, Efficiency and Usable Capacity
Estimate the runtime of a 2 kW load on a 48 V, 100 Ah battery bank from usable capacity and inverter efficiency, and see the limits of the model.
Electrical & Power · Last reviewed
Given
A constant 2.0 kW load runs from a 48 V (nominal), 100 Ah battery bank through an inverter. For this exercise assume 80% of the nominal capacity is usable before the battery must stop discharging, and an inverter efficiency of 92%.
Find
The estimated runtime, and what the answer depends on.
Solution
Related tools and labs
Calculators, labs and simulators are part of the All-Access Pass.
More worked problems
- Size the Branch Circuit for a 40 hp, 460 V Motor
- Voltage Drop on a 240 V Single-Phase Feeder
- Office Lighting Load: Connected Power and Current
- Challenge: The Current That Looks Too High
- Size a Three-Phase Transformer for a Mixed Load
- Power Factor Correction: How Many kvar of Capacitors?
- Pump Head, Shaft Power and Motor Size
- Sensible Cooling Capacity from Airflow and Temperature Difference
Questions
Why not use the full 4,800 Wh?
Discharging a battery to empty shortens its life and may not be possible, because the inverter or battery management stops at a minimum voltage. The usable fraction is a planning assumption.
How do I get a longer runtime?
Add battery capacity, reduce the load, or use batteries rated for a higher discharge rate. Doubling the energy roughly doubles the runtime in this model.
Is the usable fraction a code requirement?
No. Here it is an exercise input. Battery makers give the real limits for their product.