A capstone design assignment — a wind farm collector substation and transmission interconnection — plus drawing-interpretation and fault-analysis practice, a comprehensive final quiz, and your certificate of completion.
This closing module is deliberately not a new topic — it's where everything from Modules 1 through 19 gets applied, unassisted, to one more design problem you haven't seen solved anywhere else in the program: a 100 MW wind farm's collector substation and 138kV point of interconnection, ground not covered by any of the five real-project case studies. The unlocked module below includes the full assignment brief, a drawing-interpretation exercise built from the five real-project case studies, a fault-analysis exercise built from Modules 8 and 9, a self-check checklist, and a grading rubric you can score your own work against.
Completing this module's quiz marks every module in the program complete and unlocks your certificate of completion from the program hub — a self-issued personal completion record and portfolio artifact, not a licensing credential.