Real Project: Cellular Base Station

A three-sector macro site carrying LTE Band 12 (700 MHz), LTE Band 2 (1900 MHz), and 5G NR n77 C-band (3.7 GHz) Massive MIMO — two full worked coverage-radius calculations run side by side to show, in numbers, why carriers layer bands rather than build on one alone.

The project brief: a 45 m monopole with tower-top RRUs and a 64T64R Massive MIMO Active Antenna System per sector, a ground shelter housing the baseband unit and DC power plant, fiber-primary backhaul with a licensed-microwave diverse path, and a power/battery/generator design sized against a real equipment load. Every equipment choice — from RRU placement to antenna downtilt — is made to close two specific link budgets, not just to look reasonable on a spec sheet.

This module walks the whole project end to end: equipment architecture and why the broadcast-beam EIRP (not the flattering beamformed figure) governs coverage planning, a full worked Okumura-Hata link budget for the 700 MHz coverage layer, a full worked 3GPP UMa link budget for the C-band capacity layer, the site-planning tradeoff those two radii create for coverage-driven vs. capacity-driven grid spacing, backhaul, and a power/grounding/battery-backup design built around a real equipment power budget. The full worked numbers and complete bill of materials are part of the unlocked module below.

Free related reading in this studio
→ Link Budget Calculator→ Path Loss Calculator→ EIRP Calculator→ Concept Explainer: EIRP vs. ERP

Educational Use Only — No Professional or Legal Advice. All content, tools, calculators, 3D visualizations, and materials on EngineersUniverse are provided strictly for educational and informational purposes and do not constitute professional engineering, legal, safety, or consulting advice. Always consult a licensed professional engineer before making any design, installation, or safety decision. References to NFPA, NEC, IBC, ASME, IEEE, UL, and other standards are for educational illustration only; all trademarks and standards are the property of their respective organizations. EngineersUniverse accepts no liability for any loss, damage, injury, or consequence arising from reliance on this content. Use of this site constitutes acceptance of our full disclaimer.

DisclaimerPrivacy
StudiosWeb AppsDesignersExam PrepArticlesGlossaryCareersiOS AppsAboutSitemapRSS Feed
© 2026 EngineersUniverse. All rights reserved.Contact: engineersuniverse26@gmail.com