Real Project: 13.8kV Campus Distribution Substation

A 13.8kV substation stepping down from a 69kV utility feed to serve an entire campus — the only project in this program engineered above 600V, sitting deliberately at the boundary between electrical engineering and power systems engineering.

The project brief: a 13.8kV distribution substation serving a large campus/industrial site — roughly 15 MVA of connected load — stepping down from a 69kV utility subtransmission feed through a main-tie-main pair of 15/20 MVA power transformers, feeding a campus-owned medium-voltage distribution loop that reaches a dozen unit substations. Every other project in this program lives entirely below 600V inside one building's service; this one is the utility connection point itself, engineered at medium voltage for an entire campus.

This module walks the whole project the way a campus/industrial electrical engineer actually needs it: how to read the substation's one-line diagram and main-tie-main topology, a worked power transformer sizing and short-circuit fault current calculation that drives breaker selection, the core protective relay functions (50/51, 87, 27/59) shown on the one-line, the IEEE 80 grounding grid concept behind step and touch voltage, and — explicitly — where this project's scope ends and a dedicated Power Systems Engineering program's scope begins. The full worked numbers and complete bill of materials are part of the unlocked module below.

Free related reading in this studio
→ Short-Circuit Study Tool→ Substation Battery Sizing Calculator→ HV Ground Grid Calculator (IEEE 80)→ Concept Explainer: The Per-Unit System

Educational Use Only — No Professional or Legal Advice. All content, tools, calculators, 3D visualizations, and materials on EngineersUniverse are provided strictly for educational and informational purposes and do not constitute professional engineering, legal, safety, or consulting advice. Always consult a licensed professional engineer before making any design, installation, or safety decision. References to NFPA, NEC, IBC, ASME, IEEE, UL, and other standards are for educational illustration only; all trademarks and standards are the property of their respective organizations. EngineersUniverse accepts no liability for any loss, damage, injury, or consequence arising from reliance on this content. Use of this site constitutes acceptance of our full disclaimer.

DisclaimerPrivacy
StudiosWeb AppsDesignersExam PrepArticlesGlossaryCareersiOS AppsAboutSitemapRSS Feed
© 2026 EngineersUniverse. All rights reserved.Contact: engineersuniverse26@gmail.com