EngineersUniverseHome
Access All Content
← Applied HVAC Engineering Professional Program
Phase 4: Real ProjectsModule 19 of 25

Real Project: Distribution Warehouse HVAC Design

A 250,000 sq ft, 32 ft clear-height distribution warehouse — unit heaters and HVLS destratification fans for the bulk storage floor, radiant dock heat and air curtains at the loading dock, and a single small RTU carved out just for the office mezzanine, all built around the industry-standard heating/ventilation-only design philosophy for buildings like this one.

Ventilation Calculator ↗Cooling Load Calculator ↗System Architecture Tool ↗
12345Foundations
6789Systems & Design
101112Field Skills
131415161718📦2021Real Projects
22232425Resources & Certification
🏭Next module · Module 20Manufacturing Plant→
About this module

The project brief: a 400 ft × 625 ft, 32 ft clear-height dry-storage warehouse with a 40-door loading dock and a 2,500 sq ft office/break room mezzanine, in a cold-climate location with a 5°F winter design temperature. The overwhelming majority of this building — the racked storage floor — is never cooled at all, which is the deliberate, standard design philosophy for buildings like this rather than an oversight, and it's the central engineering question this case study answers.

This module walks the whole project end to end: a full worked heat loss calculation (envelope conduction plus infiltration) driving a 10-unit-heater count, why HVLS destratification fans reduce heating energy in a 32 ft-tall space, the unit-heater-vs-radiant tradeoff at the loading dock, CO-sensor-staged makeup air ventilation for the propane forklift fleet, and the one small conditioned space — the office mezzanine — where conventional comfort cooling actually is used. The full worked numbers and complete bill of materials are part of the unlocked module below.

Educational Use Only — No Professional or Legal Advice. All content, tools, calculators, 3D visualizations, and materials on EngineersUniverse are provided strictly for educational and informational purposes and do not constitute professional engineering, legal, safety, or consulting advice. Always consult a licensed professional engineer before making any design, installation, or safety decision. References to NFPA, NEC, IBC, ASME, IEEE, UL, and other standards are for educational illustration only; all trademarks and standards are the property of their respective organizations. EngineersUniverse accepts no liability for any loss, damage, injury, or consequence arising from reliance on this content. Use of this site constitutes acceptance of our full disclaimer.

DisclaimerPrivacy
All Access·Studios·Certification & Licensing Exams·Professional Programs·Labs·Gallery·Web Apps·Designers·Articles·Glossary·Worked Problems·Comparisons·Troubleshooting·Case Studies·Exam Study Plans·First 90 Days·Standards & Codes·Free Learning Resources·AI Digest·Jobs·Services·Careers·iOS Apps·Books·About·Contact·Sitemap·RSS Feed
© 2026 EngineersUniverse. All rights reserved.