Calculate productive time, not an average of percentages
Availability = running minutes / planned minutes. Performance = ideal production minutes / running minutes. Cycle-weighted quality = ideal good minutes / ideal total minutes. Their product equals ideal good minutes / planned minutes. For mixed cycles this is an explicitly time-weighted teaching aggregate, not an unweighted good-count ratio.
Read the downtime chart before assigning a cause
The ranked chart identifies which recorded line/shift has the most stop minutes. It does not identify the root cause, classify planned versus unplanned stops automatically or establish a site-specific target. Keep product mix, scheduled time and ideal-cycle definitions consistent.
Import a bounded, reviewable dataset
Download the CSV template or JSON example, preserve the field names, then import 1–500 records up to 256 KiB. Good counts cannot exceed total counts; stop time cannot exceed planned time; ideal production minutes cannot exceed running time. Invalid changes are rejected as a whole.
Separate records from evidence
A shift record is entered or imported by the operator. The dashboard neither reads machine counters nor reconciles energy-meter timestamps. Use verified source logs and a consistent production boundary before applying these calculations to a real line.
Worked example
- Filter Line A and Shift 1. Planned time is 480 min, stops are 60 min, ideal cycle is 0.5 min/unit, total output is 750 units and good output is 720 units.
- Running time of 420 min gives availability of 87.5%. Performance = 375/420 = 89.286%; quality = 720/750 = 96%. OEE = 360/480 = 75%.
- At 180 kWh, energy per good unit = 180/720 = 0.25 kWh/unit. Change stop time to 90 min without increasing production beyond the resulting running-time boundary and inspect the result.
Questions and interpretation
Can I use my own data?
The three dashboards and integration lab accept bounded CSV/JSON data matching their downloadable templates. The production and portal demos use explicit local scenario controls; all six can export their activity or dataset. No analysis-service upload is used.
Does this connect to my company systems?
No. These are original local tools and teaching simulations. Existing website access and analytics still apply. Real PLC, ERP, MES or customer-account connections would be a separate implementation.
What is saved?
Working state is session-local. Download CSV/JSON or a formatted report before leaving. No automatic cross-device or cloud synchronization is included.
Prepare an activity report
Use View / print study report to review a clean summary of your activity, then print it or save a PDF. Download study report (PDF) creates a formatted document with the actual assumptions, results, interpretation and references. Charts and baseline comparisons are included where applicable; security reports summarize recorded runs. Website navigation, purchase panels and unrelated page content are excluded.
References and verification
The linked sources explain the background. The interactive calculations and scenarios are original teaching exercises with explicit assumptions, not certified equipment selection, measured performance or a real security assessment.
Continue the study
Explore the other workbenches
- Asset & Maintenance Dashboard
- Building Energy & Utilities Dashboard
- ERP-to-MES Production Workflow Lab
- Systems Integration & Data Mapping Lab
- Client Service Portal Workflow Demo
- Graph Digitizer & Test Report Workbench
- Electrical Distribution & Protection Workbench
- HVAC System & Energy Workbench
- Pump & Piping System Workbench
- Fire Alarm System Design Workbench
- Motor & Drive Selection Workbench
- Structural Beam & Load Path Workbench
- Solar & Battery Microgrid Workbench
- SCADA & Control Loop Workbench
- GPU Memory / VRAM Sizing Calculator
- 800 VDC Power Architecture Explorer
- AI Agent Identity & Security Lab
- Data-Center Water & Energy Comparison
- Inside a Liquid-Cooling System / CDU