Follow the state transitions
Start a run from an explicit order, stock, per-product material requirement and single-shift capacity. Reserve materials before scheduling, confirm machine availability before production and record produced/rejected quantities before quality release.
Make blocked handoffs explain themselves
A shortage, insufficient shift capacity, unavailable machine, absent review or unresolved partial-fulfillment decision blocks the next transition. Changing a draft does not silently change an active run; start a new run to apply it.
Respect the teaching boundary
One product and one job are modeled, with no replenishment, automatic rework, return of unused reservation, multi-shift optimization, purchasing or accounting integration. All inventory and event history are fictional and session-local.
Keep a reviewable activity trail
Every completed transition adds a local event. The downloaded report contains the active order assumptions and recorded decisions. Starting a new scenario resets the active run, so export any activity you want to retain first.
Worked example
- Start with an order for 100 units, 250 material units, 2 material units per product and capacity of 120 units/shift.
- Reservation consumes 200 available material units, leaving 50. Schedule, start the machine and record 100 produced with 5 rejected.
- Record the quality review. Release of 95 good units requires explicit acceptance of partial fulfillment. The order still has 5 unfulfilled units; no real ERP or stock system is changed.
Questions and interpretation
Can I use my own data?
The three dashboards and integration lab accept bounded CSV/JSON data matching their downloadable templates. The production and portal demos use explicit local scenario controls; all six can export their activity or dataset. No analysis-service upload is used.
Does this connect to my company systems?
No. These are original local tools and teaching simulations. Existing website access and analytics still apply. Real PLC, ERP, MES or customer-account connections would be a separate implementation.
What is saved?
Working state is session-local. Download CSV/JSON or a formatted report before leaving. No automatic cross-device or cloud synchronization is included.
Prepare an activity report
Use View / print study report to review a clean summary of your activity, then print it or save a PDF. Download study report (PDF) creates a formatted document with the actual assumptions, results, interpretation and references. Charts and baseline comparisons are included where applicable; security reports summarize recorded runs. Website navigation, purchase panels and unrelated page content are excluded.
References and verification
The linked sources explain the background. The interactive calculations and scenarios are original teaching exercises with explicit assumptions, not certified equipment selection, measured performance or a real security assessment.
Continue the study
Explore the other workbenches
- Industrial Operations Dashboard
- Asset & Maintenance Dashboard
- Building Energy & Utilities Dashboard
- Systems Integration & Data Mapping Lab
- Client Service Portal Workflow Demo
- Graph Digitizer & Test Report Workbench
- Electrical Distribution & Protection Workbench
- HVAC System & Energy Workbench
- Pump & Piping System Workbench
- Fire Alarm System Design Workbench
- Motor & Drive Selection Workbench
- Structural Beam & Load Path Workbench
- Solar & Battery Microgrid Workbench
- SCADA & Control Loop Workbench
- GPU Memory / VRAM Sizing Calculator
- 800 VDC Power Architecture Explorer
- AI Agent Identity & Security Lab
- Data-Center Water & Energy Comparison
- Inside a Liquid-Cooling System / CDU